2019交房工作计划精选5篇

山崖发表网工作计划2022-12-19 10:23:27104

2019交房工作计划 第一篇

房产项目交房前准备工作

房产项目交房前准备工作提要:提前电话通知业主,通知业主来交房时带齐交房、办理产权、按揭、余款等。(电话过于提前,会造成业主提前到场要求先验房 更 多资讯

房产项目交房前准备工作

一、客户部

1、收集业主名单;(可交房资格审查及商议处理办法,包括款项不齐,按揭手续未办)(一定要核实业主的详细地址,如有变更,要求业主提供书面通知)

2、提前通知业主交房,以信函、电话通知为主(形式上只承认挂号信或快递方式。电话只是辅助手段)

3、统一说词。(一般由客服部及物业公司牵头)

4、提供各式交房表单及流程。

备注:

信函内容包括,业主交房所需的材料,按揭所缺材料、余款数额。

报纸广告由营销部开始设计交房广告。以营销部开始构思销售部交房氛围布置。(可以商榷。如问题较多,还是低调一些)

提前电话通知业主,通知业主来交房时带齐交房、办理产权、按揭、余款等。(电话过于提前,会造成业主提前到场要求先验房,或造成业主提前集会,发生不测)

二、财务部与项目销售部

1、提交资料与款项未清客户名单。

2、确认手续齐全客户名单。

二、工程部:

1、工程部联合物业部,检查各套住宅、店面的质量情况(包括:门、窗、水、电、锁、电梯、公共照明等公共设施的正常使用和确认的最终开通时间);工地工程人员居住情况及清理现场.(相当艰巨、复杂。)

2、由工程部提供《竣工验收备案表》(最重要的东东)

3、已验收合格的套房向物业交接锁匙。(防备建筑单位不做钥匙移交。谁让开发商没结工程款!)

4、由房管局出示的面积表盖章。(一般在竣工备案表之后。但是所有费用计算的依据。一定要准确,最容易出争端的地方)

三、物业部:

1提前在销售部与物业部展示:业主公约、交房流程、装修制度等相关约定。(收费标准及收费依据)

2、相关人员尽快到岗。

3、提出交房方案及应急预案。

4、指派专人对销售部人员进行适当培训和相关客户问题解释。

5、制作物业使用交房答客问。

6、对小区的相关物业费的收取制定人性化标准,对各种情况提前做出相应的收取方法及标准。

7、确定物业管理合同;

8、根据小区的实际情况编写和印制《住户手册》、《消防安全责任书》、《住宅质量保证书》、《住宅使用说明书》

9、印刷以下各类入住表格:

*《业主资料领用登记表》

*《装修申请表》

*《住宅使用说明书》

*《住宅质量保证书》

*《钥匙领用登记表》

*《入住验房表》

*《业主(住户)入住基本情况登记表》

10、熟悉掌握本项目的工程情况。

11、区内环境布置:

*入口处挂欢迎横幅,插彩旗,营造热烈的气氛。

*插指路牌,由入口处到管理处。

*管理处办公环境。

12、已租赁客户的交房流程(及收费)。

13、熟悉了解本项目详细情况

14、与销售部密切配合:客户在销售部的所有相关手续齐全后,(包括:按揭资料手续完成、购房余款、面积差价补足)由销售部确认并出具交房通知书与物业部方可与客户办理相关手续。

四、公司

1、提前报纸通知交房。(一般无太大必要)

总之,交房时法律手续要完备;一切按合同办理;态度要和蔼、语言不卑不亢;现场不过于热闹;可以引进装修公司分散业主注意力;不宜让业主过于集中办理;设置

1、2个相对安静的洽谈间以便不测之需!

2019交房工作计划 第二篇

第一章 总则 ····································································································· 3

1. 1 总则 ································································································································· 3

1. 2 相关职责界定 ················································································································· 4

第二章 入住组织架构与职责 ··········································································· 4

2. 1 入住工作小组组织架构 ································································································· 4

2. 2 工作职责 ························································································································· 5

建设单位交房小组职责 ······················································································· 5

物业交房小组职责 ······························································································· 5

第三章 入住工作计划 ······················································································ 6

3. 1 整体工作计划 ················································································································· 7

3. 2 集中入住第一天工作计划 ····························································································· 8

第四章 入住工作流程 ······················································································ 9

4. 1 入住流程图 ····················································································································· 9

4. 2 入住流程明细 ··············································································································· 10

注意事项 ······················································································································ 12

第五章 入住应急预案 ···················································································· 13

第六章 附件清单 ···························································································· 13

第七章 人员定岗及物料准备 ········································································· 14

第八章 交房手续办理日程安排表 ································································· 15

第九章 入住现场布置方案 ············································································· 16

9. 1 入住现场布置的目的 ··································································································· 16

9. 2 入住现场布置要求 ······································································································· 16

入住布置时间要求 ···································································································· 16

9. 3 各社区部位布置要求 ··································································································· 18

入住现场布置所需物资清单及预算 ············································································ 20

第一章

1 1 .1 1 总则

交房入住是业主人生大事,也是建设单位在房产建设的最关键的闭环,是物业服务企业服务形象建立的最佳时期,建设单位和物业公司应相互配合,严密策划和组织新项目的业主集中交房工作。为业主提供便捷、高效、有序的交房服务; 新项目集中交房工作由项目所在建设单位主导,物业公司配合; 物业公司应配合建设单位履行房屋保修义务,在保修期内使工程质量问题得到及时、有效的处理,切实维护业主合法权益和建设单位的品牌形象;

1 1 .2 2 相关职责界定

建设单位与物业管理处负责组织成立交楼交房领导工作小组,批准交房工作方案,组织交房准备工作,确定交房时间。负责各项目交房管理工作的指导和监督; 物业公司负责具体编制物业交房方案,按计划准备及组织实施交房管理工作; 建设单位工程部负责协调监理公司和施工单位参与交楼验收工作,对业主的房屋质量问题确定整改时间并反馈业主;

第二章

入住组织架构与职责

2 2 .1 1 入住工作小组组织架构

入住工作小组 物业交房小组 建设单位交房小组 入住手续办理流程组 入住手续办理支持组 秩序维护组

保 洁 组

后 勤 组 5 物业缴费组 6 领取钥匙组 7 验收房屋组 8 答

组 4 物业签约组 3 权证代办组 2 结算房款组 1 接待验证组

2 2 . 2 工作职责

在业主入住过程中,除了物业小组之外,还会涉及到建设单位成立的入住小组,工作职责详细描述如下:

建设单位交房小组职责

小组职位

2019交房工作计划 第三篇

物业在交房前的准备工作

1、物业人员尽快到岗及人员到岗后培训,物业智能收费软件的安装培训,办公场地的装饰装修,订做工服、办公设施及设备的配置、确定制作楼、单元、层户的门牌号码。

2、提前在销售部与物业部展示:业主临时规约、交房流程、装修制度等相关约定。(收费标准及收费依据)。

3、提出交房方案及应急预案。

4、对交房参与人员进行适当培训和相关客户问题解释。

5、制作物业使用交房答客问。

6、对的物业费的收取制定人性化标准,对各种情况提前做出相应的收取方法及标准。(收费项目:物业费、电梯运行费、卫生费、装修施工垃圾清运费、装修押金、契税、专项维修资金、房产证代办费等)更多精彩加物业社区微信。

7、确定前期物业管理服务合同。

8、根据小区的实际情况编写和印制《住户手册》、《消防安全责任书》、《住宅质量保证书》、《住宅使用说明书》。

9、印刷以下各类入住表格:

《业主资料领用登记表》、《装修申请表》、《住宅使用说明书》、《住宅质量保证书》、《钥匙领用登记表》、《入住验房表》、《业主(住户)入住基本情况登记表》等。

10、熟悉掌握本项目的工程情况。

11、园区内环境布置:

入口处挂欢迎横幅,插彩旗,营造热烈的气氛。

插指路牌,由入口处到交房大厅。

管理处办公环境。

12、已租赁客户的交房流程(及收费)。

13、熟悉了解本项目详细情况。

14、与销售部密切配合:客户在销售部的所有相关手续齐全后,(包括:按揭资料手续完成、购房余款、面积差价补足)由销售部确认并出具交房通知书与物业部方可与客户办理相关手续,更多精彩加物业社区微信。

15、及时向上级主管部门(房管所、物价局)上报申请工作(完善物业接管与物业收费标准申请备案)。

16、与供水、供电、供气、排污(城市配套设施)、通讯、有线电视等单位的商讨有关费用的代收代缴,促使协议的达成。

2019交房工作计划 第四篇

交房前业主关心的若干问题

1、卫生间排污管道问题

卫生间的排污管道不是储水管弯头。

开放商应提出整改措施,负责实施

2、门拉手问题

入户门把手用力拉后会变形。

由开发商负责整改

3、交房收费的规范问题

天然气代收费2800元,电费预存费300-500元,闭路电视开户费500元,预收办理房产证费用1000元。物业部收取一次性垃圾清运费400元,装修履约金1000元,水费保证金300元,资料费10元。

哪些必须交的,哪些是自愿交的,哪些是给开放商,哪些是给物业的,哪些费用是可以退的,哪些费用是预存的?

4、物业费的收费标准问题

每月物业费元m2+电梯使用费元/m2,收费标准是否合适?免首年的物业费是否还需业主付电梯使用费,为什么要单独列出电梯使用费,如果不使用电梯是不是可以拒交元。

5、交房时间违约问题

交房时间是否违约,需不需要付给业主违约金。

6、房屋交房前的三书一证一表

三书”是指《住宅质量保证书》、《住宅使用说明书》、《建筑工程质量认定书》,“一证”是指《房地产开发建设项目竣工综合验收合格证》,“一表”是指《竣工验收备案表》。

2019交房工作计划 第五篇

交房前准备工作流程

1、获得环评报告、水电检测报告

具体工作内容:由环保局进行空气质量及噪音检测,供电局、自来水公司进行水、电检测。

流程所需时间:最快需要1周时间。

2、水通、电通且压力正常

具体工作内容:变压器移到小区指定位置后通电,由电力局测试电压。通水,由自来水公司测试水压。

流程所需时间:2—3个月。此项工作比较费时,至少需要提前两个月左右开始跟电力公司协调移变压器的问题(需要协调的问题主要是该片区要有停电计划,才可移变压器进小区)。正常情况下,变压没有固定正常是不能申请验房的。

3、内部分户自验

具体工作内容:由开发商协同监理公司、物业管理公司进行工程质量分户检验,并向施工方提出整改意见。

显示全文

注:本文部分文字与图片资源来自于网络,转载此文是出于传递更多信息之目的,若有来源标注错误或侵犯了您的合法权益,请立即后台留言通知我们,情况属实,我们会第一时间予以删除,并同时向您表示歉意

点击下载文档

文档为doc格式

发表评论

评论列表(7人评论 , 39人围观)

点击下载
本文文档